Coldwell Banker, located in Cincinnati, OH, was completed in March of 2016. This 4,200 SF space featured polished concrete floors, aluminum interior storefronts and stone veneer accent wall. CRC coordinated the entire construction process through Coldwell’s Construction Team, located in Chicago, IL, and communicated throughout the process to ensure the project was delivered on time and under budget.

4800-4900 Poth Road

Located south of John Glenn Columbus International Airport, the Poth Road Tenant Improvements consisted of 700′ of 2HR Fire Wall, (4) 10′ X 10′ high lift dock doors with mechanical levelers, bumpers and seals, (1) 10’x10′ drive in door, and a complete retrofit of the warehouse’s existing lighting system with LED high bay fixtures. To round off the interior renovations, the existing office space was repainted and new flooring installed throughout.

Due to the existing grade and building location, CRC installed a new recessed well dock for truck access to the new (4) 10′ x 10′ high lift dock doors, consisting of 120′ of retaining wall and concrete steps to access the newly installed man door. Finally, a 20′ x 700′ access road was installed to connect the existing approach to the northern building face to ensure the new tenant has complete access to the added amenities.

Wexner Heritage Village

A 6,000 SF demolition and reconfiguration of an existing wing to accommodate eight resident rooms, a servery, common areas, and staff facilities. The project schedule was three months and completed on time in August 2015.

Mickey’s Bar

Mickey’s Bar, located off W 5th Ave, in Columbus, Ohio called on CRC Inc., to work with them in completing exterior renovations to the best karaoke bar in town.